
- Rockbridge County Sheriff's OfficeRegierungsinstitution
- Journalist/in
- Rockbridge County Public SchoolsÖffentliche Verwaltung und Regierungsbehörde
- Rundfunk- und Medienproduktionsfirma
- Nachrichtensprecher/in
- Mehr anzeigentriangle-down
WDBJ7's Bruce Young hat einen Beitrag geteilt.

"We want them to feel like they are back at Green's."
Wait until you see what this couple is doing inside the former Green's Drug Store to honor the Bedford Bo...ys and their sacrifice.
The intersection of N. Main St. and Bridge St. will be closed April 27th for a dedication ceremony.
https://www.wdbj7.com/…/Paying-tribute-to-the-Bedford-Boys-…
WDBJ7's Bruce Young hat einen Beitrag geteilt.

AN UPDATE ON THE ROUTE 220 ROAD WORK NORTH OF FINCASTLE FROM VDOT - NOTE THE DETOUR STARTING NEXT WEEK.
RELEASE:
IMMEDIATE
March 26, 2019...
CONTACT:
Jason Bond 540-387-5493 (office)
SALEM 77
TRAFFIC ALERT: PIPE REPLACEMENT TO DETOUR SOUTHBOUND ROUTE 220 IN BOTETOURT COUNTY FOR ABOUT TWO WEEKS
SALEM – Beginning April 1, southbound Route 220 traffic in Botetourt County north of Fincastle will be detoured for an estimated 10 to 14 days due to ongoing work to replace a damaged section of pipe near Route 220’s intersection with Route 679 (Peck Road/Martins Lane).
All southbound traffic will use a signed detour: Mary Alice Road to West Wind Road to Old Fincastle Road to return to Route 220. Residents along the detour route will be able to access their homes. Drivers should expect delays and heavier traffic on secondary roads in the vicinity of the closure.
Tractor-trailers and large industrial vehicles should avoid southbound Route 220 and seek alternate routes such as Interstate 64 and Interstate 81.
Northbound Route 220 traffic will remain shifted into a single lane with the speed limit reduced to 35 mph.
Crews with the Virginia Department of Transportation continue to work to replace a 110-foot section of pipe that was destroyed beneath northbound Route 220 when a tanker overturned and caught fire on February 20.
A replacement pipe has been assembled and now must be joined to the old section of pipe beneath southbound Route 220. To make the connection, workers will be excavating, placing concrete footers and installing a steel splice joint beneath the inside southbound lane. During the excavation and construction, it is not safe for vehicles to be travelling on the lane.
Once the pipe connection is complete, the southbound detour will be removed and Route 220 traffic will return to a two-way pattern with one lane open in each direction.
After the southbound Route 220 detour is removed, VDOT is estimating another four to six weeks before the northbound lanes of Route 220 are repaired and all four lanes are open to traffic.







































